Monday, 14 September 2009
the chassis arrived, and soon set work on getting the panels fitted and rivited, most of thses went on with out to much of a problem, ok there was the normal miss fits of the seat belt harness mounts on the transmission tunnel, verious panels needed trimming to stop nasty over lap with the chassis rails, nothing a pair of snips can't sort out. a good bead of silicone was placed behind every panel to stop water ingression, before being rivited up (by hand) and then all corners and exterior panels had more silicone added to keep feet dry.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment